Quality First Customer Foremost

Rongcheng Rongtong Shipping Co., Ltd. is a joint-stock company under the jurisdiction of the Emergency Bureau of Shidao Management District of Rongcheng City. It was originally Rongcheng Shipping Company Shipyard, founded in 1970, Rongcheng Rongtong Shipyard was established in 1992, and was restructured into a joint-stock enterprise in 2004. The company has 100 permanent employees.

The company is located in Shidao Bay, Rongcheng City, adjacent to the national first class open port Shidao Port, south to Rongcheng Shipbuilding Group, north to Huanghai Shipbuilding Co., LTD., east longitude 122°25 '400 ", latitude 36°53' 600 ". The front waters of the wharf of the plant are wide, the flow is slow and the waves are flat, and the water is not frozen all the year round. It is a natural harbor for all kinds of ships to shelter from the wind, and there are unique natural conditions for the development of ship construction.

The company takes "quality first, customer first" as the business purpose, unity and hard work, innovation, dedication, and constantly strengthen enterprise management, and has won the honorary title of municipal advanced production unit for many times.

The company repairs more than 100 international and domestic cargo ships every year. More than 400 fishing vessels were repaired, with major projects including overhaul and replacement of main and auxiliary engines; Replacement and repair of stern shaft and rudder system; Fishing exploration machine, radar, safety guide repair and replacement; Hull engineering, ship reconstruction engineering.


  • 1970

    The company was founded in (year)

  • 40000

    Total area of factory building (㎡)

  • 70

    Company technical staff (person)

  • 500

    Repair fishing vessels (ship)

High quality and specialized products and services
  • Hull engineering, ship renovation engineering

  • Repair and replacement of fishing detectors, radars, and navigation systems

  • Replacing and repairing the stern shaft and rudder system

  • Major overhaul and replacement of main and auxiliary equipment

  • Equipment and facilities

    Equipment and facilities

    1. One 8000 ton shipyard (with an empty displacement of 4000 tons) was put into operation in August 2009. Mechanical slipway allows ships to dock and dock.

    2. One 5000 ton shipyard (with an empty displacement of 3000 tons) was put into operation in July 2004. Mechanical slipway allows ships to dock and dock.

    3. Two 1000 ton berths (with an empty displacement of 500 tons) were put into operation in 1999. Mechanical slipway allows ships to dock and dock.

    4. One outfitting dock with a length of 200 meters.


    contact number

    18663180988

    18763156188


    News

    News information

    contact us

    Mr. Han: 18663180988

    Mr. Jiang: 18763156188

    Company Phone: 0631-7382591


  • Email:

    rtcyyxgs@163.com

  • URL:

    www.rcrongtong.cn

  • Address:

    No. 298 Huanghai South Road, Shidao, Rongcheng City, Shandong Province

  • Fax:

    0631-7382602

  • Mobile phone official website

  • contact us

    Mr. Han: 18663180988

    Mr. Jiang: 18763156188

    Company Phone: 0631-7382591


  • Email:

    rtcyyxgs@163.com

  • URL:

    www.rcrongtong.cn

  • Address:

    No. 298 Huanghai South Road, Shidao, Rongcheng City, Shandong Province

  • Fax:

    0631-7382602

  • Mobile phone official website